UWA Logo Tectonics Special Research Centre
   UWA HomeProspective Students | Current Students | Staff | Alumni | Visitors | About |     Search UWA    for      
Page Information : About IGCP 440 Project

This page provides technical and administrative information regarding Tectonics Special Research Centre - About IGCP 440 Project. For enquiries about the contents of the referring page, contact addresses in the Ownership table, below.

For general enquiries please check the General Enquiries page.

For technical issues or problems relating to these web pages, contact the University Website Office.

Return to referring page

Page Properties
Site Name
Tectonics Special Research Centre
Page Name
About IGCP 440 Project Page ID: 28288  
Short Page NameAbout IGCP 440 Project
Description
Keywords About IGCP 440 Project Amalgamation of the Rodinia Supercontinent is the major geodynamic event during the Mesoproterozoic era. Parts of Rodinia survived until the Mesozoic fragmentation of Pangea; other parts broke up in the Neoproterozoic The record of amalgamation and break-up of Rodinia is preserved in Mesoproterozoic mobile belts and Neoproterozoic basins present at the margins of most Paleoproterozoic cratons.       The objective of the project is to obtain a robust database and framework for interpretation of the geodynamic evolution of the continental lithosphere during the late Mesoproterozoic and Neoproterozoic. The project is structured to: Determine the configuration of Rodinia and the sequence of events in the amalgamation process; Determine whether the Paleoproterozoic cratons originated by breakup of an older, pre-Rodinia supercontinent, or were independent fragments of continental crust Improve and enhance the understanding of the breakup of Rodinia during the Neoproterozoic Allow analysis and interpretation of the distribution of Mesoproterozoic and Neoproterozoic mineral resources in a geodynamic framework Create a tectonic database from which geodynamic models and maps of the assembly and break-up of Rodinia can be constructed The foundations for the new project were laid by IGCP Project 288 – "Gondwanaland sutures and fold belts", completed in 1996.   Project Leaders Svetlana Bogdanova Email: Henri Kampunzu Email: Zheng-Xiang Li Email: zli@tsrc.uwa.edu.au Project Secretary Sergei Pisarevsky Email: spisarev@tsrc.uwa.edu.au   Photograph "Village" Northeastern Jiangxi Field Region, China © M. Greentree
URL(s) http://www.tsrc.uwa.edu.au/page/28288
Source http://www.tsrc.uwa.edu.au/page/28288
Lineage Home
About IGCP 440 Project
Rights Copyright 2009, Legal Services, The University of Western Australia
Site Management Plan Site management plan
Ownership
Content Custodian Peter Cawood (pcawood@tsrc.uwa.edu.au)
Director
Site Administrators Leanne Harrold (lharrold@tsrc.uwa.edu.au)
Michael Djohan (mdjohan@cyllene.uwa.edu.au)
Site Editors
Page Editors
Page History Today's Date is Thursday, 26th November 2009
Create Date Fri, 05 Sep 2003 14:01:07 +0800
Content Last Edited Tue, 15 Mar 2005 10:16:00 +0800
Last Editor: Leanne Harrold (lharrold)
Email: lharrold@tsrc.uwa.edu.au
Content Last Approved Tue, 15 Mar 2005 10:16:00 +0800
Last Approval: Leanne Harrold (lharrold)
Email: lharrold@tsrc.uwa.edu.au
Next Review Date A review date has not been set for this page.
Technical
Generator MySource Content Management System, see http://mysource.squiz.net/
MySource is a www.squiz.net initiative
Format
Mime Type: text/html

Return to referring page


Top of Page CRICOS Provider Code: 00126G